Pillar Rebuild

This pillar was structurally unstable, we deconstructed it and removed all existing mortar and debris. Then rebuilt the pillar using NHL 3.5 ensuring the appropriate materials were used. The gate hanger was rebuilt in the exact same position and resecured with the original lead that once held it in place. 

Brick Rebuild

Below you will see where we removed a window to create a doorway. 

The brick used was reclaimed and sourced from a salvage yard and built using NHL 3.5.

 

Patch Rebuilding

This section of brick work was decaying away from years of trapped moisture thanks to sand and cement plastering. The client sought to have the brick removed and reclaimed stone built in its place.

 

Had the building being plastered in lime it would have allowed the natural materials to breathe and expel moisture.

 

The stone was rebuilt using NHL 3.5.